Dense below-slab insulation was used to achieve Passivhaus thermal performance whilst maximising the beneficial thermal mass of the concrete. The original cottage had good foundations but the original floor slab needed to be replaced. A continuous slab was poured through the entire ground floor unifying the old and new parts of the project.